close x

Category Archives: TBM Portfolio Projects

Comely Bank Road

Comely Bank Road

Areas of Involvement.
Electrical
Joinery
Plastering
Tiling
Painting and Decorating
Flooring

 

The Brief and Process.

Here at Comely Bank Road, central Edinburgh, TBM Property carried out a complete renovation of a ground floor flat which included painting and decorating, electrical work, flooring and the supply of new windows, floors, kitchen units and a central heating system. The flat was renovated and modernised throughout.

TBM Portfolio Projects0 comments

Moray Place

Moray Place

Areas of Involvement.
Electrical
Joinery
Plastering
Tiling
Painting and Decorating
Flooring

 

The Brief and Process.

Here at Moray Place, central Edinburgh, TBM Property carried out a part renovation of a New town flat which included painting and decorating, electrical work, flooring and the supply of new appliances. We changed the colour in the hallway to Eygtian cotton, while carefully preserving and covering the existing furniture and original wodden details. In the kitchen we prepared, painted, and decorated the walls and skirting board. The stair received a new quality 80/20 wool twist carpet with bound edges up to the first floor. In the first floor living room we perfectly matched the existing paintwork while installing new power sockets and repairing old and tired wardrobes and window shutters and frames.

July 2014

TBM Portfolio Projects0 comments

Nelson St

Nelson St

This property was an ESPC Feature Property and appeared on the cover of their property newspaper for November 2012.

Areas of Involvement.

  • Plumbing
  • Electrical
  • Joinery
  • Plastering
  • Tiling
  • Painting and Decorating.
The Brief and Process.
This project involved the demolition, refurbishment and complete installation of a new en suite bathroom and separate toilet. Relocation of an electrical fuse box, new lighting, new underfloor heating, bespoke joinery works, plastering, tiling and painting and decorating.
This required the close co-ordination of various sub contractors in order to carry out the works in the time deadline required by the client. TBM Property worked closely with the client and all works were carried out to the clients requirements and requests. They would have no hesitation in recommending our services to anyone in the future.

TBM Portfolio Projects0 comments

Heriot Row

Heriot Row

Areas of Involvement.
Plumbing
Electrical
Joinery
Painting and Decorating.

The Brief and Process.
This project involved the installation of a back pantry kitchen, removal, renovation and installation
of new bespoke toughened double glazed back doors to the garden. Creation of a new partition wall, electrical installation of a new ring circuit in the sitting room, electric shower and lighting installation, and creation of new bespoke shelving, window seats and general joinery. Renovation and installation of a period fireplace. Supply and fit of new internal period doors. Painting and decorating.

The brief from the client evolved as the project progressed from an initial estimate which involved approximately two weeks work to eventually approximately three months work involving several sub contractors. This process was co-ordinated by TBM Property with direction and close consultation with the client to ensure time deadlines were met, client targets achieved, with sympathetic attention to detail that every period property requires.

TBM Portfolio Projects0 comments

Murrayfield Place

Murrayfield Place

Areas of Involvement.
Plumbing
Electrical
Joinery
Plastering
Tiling
Painting and Decorating

 

The Brief and Process.
This project involved the installation of a shower room (where the previous contractor had failed), gas boiler move to an internal cupboard and removal of existing kitchen units and re-plastering of the whole of the kitchen area.
TBM Property carried out all the works according to the estimate provided to the client and within the time deadline required. Additional works arose as the project progressed and these were clearly explained prior to these works being carried out. Several sub contractors were used as and where these requirements arose.
The end result was a fully functional new bathroom, gas boiler and lighting (etc) and the promise from the client to recommend TBM Property as and where the need arises!

TBM Portfolio Projects0 comments

Portobello

Portobello

Areas of Involvement.
Joinery
Plastering
Painting and Decorating

The Brief and Process.
This project involved the supply and installation of new double glazed, draught proofed sash windows to a period design, much enhancing the sitting room of this Victorian building.

TBM Portfolio Projects0 comments

Nasmyth Square

Nasmyth Square

Areas of Involvement.

Plumbing

Electrical

Joinery

Plastering

Tiling

Painting and decorating

Flooring

The Brief and Process.

This project involved the complete renovation of the men’s bathroom area to create a new shower room with toilets. The creation of a new staff room with kitchen, new external doors, new windows through out the main office area and the exterior decoration of one side of the building.

June 2014

 

TBM Portfolio Projects0 comments

Wemyss Place

Wemyss Place

 

Area of Involvement.

Roofing

This project involved the repair of a severe leak into a bedroom below.

Sept 2012

 

TBM Portfolio Projects0 comments

Sinclair Close

Sinclair Close

Areas of Involvement.

 
Plumbing
Tiling
Joinery
 

The Brief and Process.

This project involved the refurbishment of a bathroom over a specific period of time to fit in with the client requirement of a weeks holiday.

Plumbing, tiling and joinery.

 

 

TBM Portfolio Projects0 comments

Elm Row

Elm Row

 

 

 

 

 

 

Areas of Involvement.

Refurbishment of shop front.

Painting and decorating.

This contract involved the painting and decorating and renovation of a shop front.

May 2013

 

 

TBM Portfolio Projects0 comments